Work Direction, Control and Surveillance
|
MAIN ACTIONS
Road Infraestructures
Control and Surveillance Atlantic motorway AP-9. Strech: Guísamo-Fene (A Coruña)
-
Construction Monitoring Control and AP-53 Santiago de Compostela - Ourense. Strech: Liaison Cea - A 52.
-
Motorway Control and Surveillance Ferrol - Vilalba AG-64. Strech: Cabreiro - Cantabrian motorway A-8.
-
Motorway Control and Surveillance Ferrol - Vilalba AG-64. Stretch: Igrexafeita - Espiñaredo.
-
Control and Surveillance Works Cantabrian motorway A-8. Strech: Mondoñedo - Lourenzá (Lugo)
-
Control and Surveillance Capacity High Way, North Corridos. Variante Ortigueira. Strech: Connecting AC-101-Espasante (A Coruña)
-
Control and Monitoring Via High Capacity Tui-A Guarda (Pontevedra). Strech A-55 Liaison - Liaison PO-350
Ports and Coasts
-
Control and Supervision of works sponsored by the Costs in A Coruña in the period 2006-2009.
-
Control and Supervision of the works of facilities and services of Ferrol Outer Harbor. Services and road networks indoors.
-
Control and Surveillance of the Works of the 2nd Phase of the outer port of Ferrol.
Development and Services
-
Management of urbanization works Fontiñas Polygon in Santiago de Compostela (A Coruña).
-
Management of works of urbanization Business Park Muros (A Coruña)
-
Management of works of urbanization Business Park Vilanova de Arousa (Pontevedra).
-
Construction management of land consolidation in Abegondo Vizoño (A Coruña)
-
Management of works of urbanization of land for development SUNP-11 Catiñeiriño, Lamas SUNP-12 Abade, SUNP-5 A Muiña Traspaxonal and SUNP-14 in Santiago de Compostela (A Coruña)
-
Control and Monitoring of the works of the main collectors of sanitation in the Rio Minho (Lugo).
|

|